In order to meet the production demand of the growing business in regional jet market as well as the assembly demand of C919 project, a new base to be located in Pudong Development Zone, Shanghai has been planned and is now under construction. Principally responsible for the development and production of large aircraft projects including the C919 project as well as the Sino-Russian Wide-body Aircraft project known as the C929, this new base is designed to be the paramount assembly & manufacturing centre based on the overall strategic planning of COMAC.
Projects under construction currently: 1. whole-aircraft interfacing line
2. horizontal tail assembly line
3. middle fuselage assembly line
4. central wing assembly line
5. mobile assembly line
Core principles of planning design: 1. Maximising flexibility/compatibility & scalability
2. Using lean boring and automatic drilling & riveting equipment
3. Minimising or eliminating the need for machine tools for assembly
4. Multiple installation in parallel
5. Safe and fast transportation (minimising the use of cranes)
6. Relaxing the requirements for indoor foundation
7. Integrating with logistics management
Main technical objectives to be achieved: 1. Digitalising measurement coordination
2. Automatisingdrilling& riveting of panel
3. Automatising boring of composite material
4. Automatising assembly interfacing
5. Integrating assembly test